# The data center factory Source: https://pacificmachines.com/ [Pre-order Pod 32](https://pacificmachines.com/#book-a-call) Pacific manufactures self-contained, portable AI data centers at scale. This is the fastest path to bringing compute online. We deliver fully operational data centers, complete when they leave the factory, to sites where the power is already developed, and they generate tokens within days. We build factories to mass manufacture the pods and the most critically constrained components of the data center supply chain. We work with AI labs, governments and defense to bring compute online fast and at scale. [Book a call](https://pacificmachines.com/#book-a-call) Pods can be single megawatt sites or clustered to form hyperscale campuses. Get in touch Book a call [Pod 32 256 NVIDIA B300s in a 40 foot container. Learn more](https://pacificmachines.com/pod-32) [Vera Rubin The next configuration, in development. Learn more](https://pacificmachines.com/vera-rubin) [Factory 1 Our factory and R&D shop in San Francisco, opening early next year. Learn more](https://pacificmachines.com/factory-1) [Sovereignty Compute that lands on your land and stays under your control. Learn more](https://pacificmachines.com/sovereignty) Work with Pacific Work with Pacific Pacific rents GPUs, builds managed clusters and sells pods to selected partners. Pod Buy the pod You own the whole module. It is configured at order, and the target is operation within three months of pre-payment. [Request a pod](https://pacificmachines.com/buy) Capacity Rent the compute Pacific's GPUs run as a managed cluster for your term. You are the only tenant. [Request capacity](https://pacificmachines.com/rent) Colocation Bring your own GPUs Your GPUs sit in a Pacific pod, with A and B power and liquid cooling already built in. [Request colo space](https://pacificmachines.com/colocate) Get in touch Book a call The factory We build factories. The data center supply chain sat idle for twenty years. AI now demands ten thousand times more than it can produce, in a matter of years. Serving that demand requires re-industrialization. SpaceX didn't just build rockets, they built rocket factories. We are [Open roles](https://pacificmachines.com/careers) --- # Pod 32 256 NVIDIA B300s in a 40 foot container Source: https://pacificmachines.com/pod-32 ## WHAT IT IS A complete data center in a 40 foot high-cube container, with power distribution, direct-to-chip liquid cooling and 32 nodes of NVIDIA B300s, 8 to a rack across 4 racks, all in one box. Power and cooling are built in and tested at the factory before it leaves. One customer gets the whole machine as single-tenant bare metal. ## HOW IT LANDS It arrives on one truck, is dropped onto a powered pad, and switches on within days once the pad is live. Under 1 MW, so it runs on a connection that already exists. Put one on a stalled site and it earns while the big build catches up, then it leaves on the same truck it arrived on. ## ONE POD OR MANY The pod is the building block. One pod is a single megawatt site, and several clustered together form a campus, with capacity growing where and when the power becomes available. Base configuration - **GPUs:** 256 NVIDIA B300 - **Nodes:** 32 HGX B300 nodes, 8 per rack across 4 racks - **CPUs:** 64 Intel Xeon 6776P - **System memory:** 128 TB DDR5 - **Local NVMe:** 983 TB raw - **Compute fabric:** 400G rail-optimised Ethernet, 3.2 Tbps per node - **Power:** 645 kW operating, 790 kW design envelope, 480 V A/B feeds - **Cooling:** Direct-to-chip liquid, closed loop, redundant CDUs, 850 kW heat rejection Configurable at order. Fabric to 6.4 Tbps per node, shared storage to around 200 TB. - Length: 12.2 m - Width: 2.44 m - 256 GPUs Work with Pacific Work with Pacific Pacific rents GPUs, builds managed clusters and sells pods to selected partners. Pod Buy the pod You own the whole module. It is configured at order, and the target is operation within three months of pre-payment. [Request a pod](https://pacificmachines.com/buy) Capacity Rent the compute Pacific's GPUs run as a managed cluster for your term. You are the only tenant. [Request capacity](https://pacificmachines.com/rent) Colocation Bring your own GPUs Your GPUs sit in a Pacific pod, with A and B power and liquid cooling already built in. [Request colo space](https://pacificmachines.com/colocate) ## FABRIC, POWER AND COOLING The 400G fabric is offered in two configurations, 3.2 or 6.4 Tbps per node. Power is fed on A and B paths throughout, and the cooling runs direct to chip, from cold plates through rack manifolds to the coolant distribution units, carrying the heat straight off the silicon. [Request capacity](https://cal.com/harper-smith/30-minute-call) --- # Vera Rubin The next configuration, in development Source: https://pacificmachines.com/vera-rubin ## THE NEXT PLATFORM NVIDIA has named Rubin as the generation after Blackwell. Pacific is designing the next configuration of the pod around it, and the work is under way now, alongside Pod 32. NVIDIA DSX POD ## Designed to the NVIDIA DSX POD reference architecture NVIDIA DSX POD is NVIDIA's reference design for containerized AI factories on the Vera Rubin platform, built by partners and delivered as complete modules. NVIDIA says a DSX POD can be running about 14 days after it reaches a prepared site. Pacific's Vera Rubin configuration is being designed to the DSX POD reference architecture. The intent is the same 40 foot container, with the power and cooling inside reworked for the new platform, so the site, the power connection and the way the pod is operated carry over from Pod 32 to the next generation. ## SAME CONTAINER The intent is the same container, with the power and cooling inside reworked for the new platform. A data center design now has to carry more than one generation of GPU, and the aim is that the site and the connection stay put while the compute inside moves on. ## STATUS The Vera Rubin configuration is in development and there is no specification to publish yet. Pod 32, with NVIDIA B300s, is the current configuration. If you are planning around Rubin, book a call. - Status In development - Designed for NVIDIA Vera Rubin Work with Pacific Work with Pacific Pacific rents GPUs, builds managed clusters and sells pods to selected partners. Pod Buy the pod You own the whole module. It is configured at order, and the target is operation within three months of pre-payment. [Request a pod](https://pacificmachines.com/buy) Capacity Rent the compute Pacific's GPUs run as a managed cluster for your term. You are the only tenant. [Request capacity](https://pacificmachines.com/rent) Colocation Bring your own GPUs Your GPUs sit in a Pacific pod, with A and B power and liquid cooling already built in. [Request colo space](https://pacificmachines.com/colocate) [Book a call](https://cal.com/harper-smith/30-minute-call) --- # Factory 1 Factory and R&D shop, San Francisco. Opening early next year. Source: https://pacificmachines.com/factory-1 ## WHY A FACTORY SpaceX did not just build rockets, it built rocket factories. Data centers today are built the way buildings are built: bespoke, on site, over years, by trades that are running out. SemiAnalysis puts electricians alone at about a third of the hours on a data center site. Pacific's factory moves those hours indoors. ## POD 1 Pod 1 will be built here first, in phases: shell and electrical, then cooling and plumbing, then compute, then GPUs. It is there to prove the engineering, the shop, the contractors and the supply chain. A production line follows, eventually run with robots. ## LONGEST LEAD PARTS The supply chain is the other half. It sat idle for twenty years before AI arrived. So Pacific is bringing the longest-lead parts in house, starting with switchgear and the transformer skid, with research under way into high-voltage transformers. - Opening Early next year - First build Pod 1 - Bringing in house Switchgear, transformer skid - 40 ft - Height: 2.9 m - Under 1 MW Work with Pacific Work with Pacific Pacific rents GPUs, builds managed clusters and sells pods to selected partners. Pod Buy the pod You own the whole module. It is configured at order, and the target is operation within three months of pre-payment. [Request a pod](https://pacificmachines.com/buy) Capacity Rent the compute Pacific's GPUs run as a managed cluster for your term. You are the only tenant. [Request capacity](https://pacificmachines.com/rent) Colocation Bring your own GPUs Your GPUs sit in a Pacific pod, with A and B power and liquid cooling already built in. [Request colo space](https://pacificmachines.com/colocate) ## SPEED, THEN RESILIENCE Today that buys speed. Over time it builds resilience: a supply chain Pacific owns, that keeps shipping when the industry's queue stops. Those parts will also be sold to the rest of the industry, and Pacific will build whatever is most constrained next. [Request capacity](mailto:harper@pacificmachines.com) --- # Sovereignty Compute that lands on your land and stays under your control. Source: https://pacificmachines.com/sovereignty ## YOUR LAND The pod lands on land you already own and runs on a connection that already exists. It can be set up as a non-permanent structure, and when the main build is ready it leaves on the same truck it arrived on. ## THE WHOLE MACHINE Each pod has one customer and runs as single-tenant bare metal, so you get the whole machine. Operating access down to BIOS, BMC, firmware and the fabric manager can be granted in the contract. Day to day the pod is run remotely, with contracted field service in your region. ## OURS OR YOURS Pacific's GPUs run as a managed cluster, or your own GPUs sit in a Pacific pod with power and cooling already built in. Either way you are the only tenant. - Site Your land - Tenancy Single tenant - Power Under 1 MW - Hardware Ours or yours - 40 ft - Height: 2.9 m - Under 1 MW Work with Pacific Work with Pacific Pacific rents GPUs, builds managed clusters and sells pods to selected partners. Pod Buy the pod You own the whole module. It is configured at order, and the target is operation within three months of pre-payment. [Request a pod](https://pacificmachines.com/buy) Capacity Rent the compute Pacific's GPUs run as a managed cluster for your term. You are the only tenant. [Request capacity](https://pacificmachines.com/rent) Colocation Bring your own GPUs Your GPUs sit in a Pacific pod, with A and B power and liquid cooling already built in. [Request colo space](https://pacificmachines.com/colocate) ## WHO IT IS FOR We work with AI labs, governments and defense that need compute on their own ground. If you need GPU clusters or colocation space at the end of this year or early next, reach out. [Get in touch](https://cal.com/harper-smith/30-minute-call) --- # Careers Pacific is hiring engineers and manufacturing leads. Source: https://pacificmachines.com/careers [Get in touch](mailto:harper@pacificmachines.com) ## We are looking for - Head of Manufacturing - Head of Finance - Solutions Architect - Data Center Technician - Site Manager --- # Buy the pod You own the whole module. It is configured at order, and the target is operation within three months of pre-payment. Source: https://pacificmachines.com/buy ## THE WHOLE MACHINE You own the whole module. It is configured at order, and the target is operation within three months of pre-payment. Each pod has one customer and runs as single-tenant bare metal, and day to day it is run remotely, with contracted field service in your region. - Tenancy Single tenant - Configured At order - Target Operation within three months of pre-payment [Pre-order Pod 32](https://cal.com/harper-smith/30-minute-call) --- # Rent the compute Pacific's GPUs run as a managed cluster for your term. You are the only tenant. Source: https://pacificmachines.com/rent ## PACIFIC'S GPUS Pacific's GPUs run as a managed cluster for your term, and you are the only tenant. Each pod has one customer and runs as single-tenant bare metal, so you get the whole machine. Day to day the pod is run remotely, with contracted field service in your region. - Hardware Pacific's GPUs - Tenancy Single tenant - Term Yours [Request capacity](https://cal.com/harper-smith/30-minute-call) --- # Bring your own GPUs Your GPUs sit in a Pacific pod, with A and B power and liquid cooling already built in. Source: https://pacificmachines.com/colocate ## YOUR GPUS Your GPUs sit in a Pacific pod, with A and B power and direct-to-chip liquid cooling already built in. You are the only tenant, so you get the whole machine. Day to day the pod is run remotely, with contracted field service in your region. - Hardware Your GPUs - Power A and B paths - Cooling Direct-to-chip liquid built in [Request colo space](mailto:harper@pacificmachines.com?subject=Colocation) --- # B200 Price: What Moves the Cost of B200 GPUs Source: https://pacificmachines.com/guides/b200-price-cost-drivers B200 price depends on term, node count, region and what the quote includes. Learn what moves B200 pricing, how to read a quote and how to compare offers. ## Why there is no single B200 price There is no single B200 price, because every quote bundles several separate choices. The hourly figure is only the most visible one. Some providers quote per GPU hour and others per node hour. A B200 SXM node in Pacific's catalog carries eight GPUs, so convert every quote to the same unit before you put two side by side. The status of the number matters too. Pacific shows preview rates for B200 SXM, and those rates stay indicative until Pacific confirms the allocation. A finance lead who copies a preview rate into a budget model and multiplies it across eight GPUs and a full quarter is planning on a figure nobody has confirmed. For the factors that apply to every GPU type, read the [guide to GPU cloud pricing cost drivers](https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers). This guide stays on B200. ## What moves a B200 quote Term length is the first lever on a B200 quote in Pacific's catalog. The B200 SXM listing shows on-demand plus reserved bands of 7-30, 31-90 and 91-180 days by request, and each longer band shows a lower preview rate. Allocation size is the second. One-node and two-node sizes are rentable directly, and four-node and eight-node sizes go by request, so a team scaling from a two-node test to an eight-node training run moves from a self-serve rental into a reviewed request with its own confirmed quote. Region is the third. Pacific lists Asia Pacific, North America and Europe for B200. Confirm the quote for the region you will actually run in, and do not assume a preview in one region carries over to another. Then look at what the price carries. Each B200 node is a dedicated bare-metal Linux host with SSH, NVIDIA drivers and CUDA installed, InfiniBand interconnect and local NVMe erased when the resource ends. Idle time is the driver you control, because a reserved node that sits unused still bills. ## How to read a B200 quote line by line Read a B200 quote one line at a time before you compare totals. A good test is whether you can rebuild the total from the lines yourself. Check the unit, the GPU count and the node count first, then the term band and the region. Next, find what the quote says about tenancy, interconnect, drivers and storage handling, since a node that arrives ready for your job saves setup hours that would otherwise sit on your bill. For provider selection, see [how to evaluate B200 cloud rental providers](https://trypacific.space/blog/b200-cloud-rental-evaluation). Then check status. Pacific's review step revalidates capacity, the current quote and terms before you commit, and a paid order is not a ready resource. An infrastructure lead planning a launch window should ask when the node is handed over and when charges start, and get both answers in writing. Missing lines are a finding. Ask for them. ## Compare B200 and H200 on cost per finished job The cheaper hourly GPU can still cost more per finished training run. The number that matters is what one completed job costs at confirmed rates. B200 SXM in Pacific's catalog carries 180 GB per GPU and H200 SXM carries 141 GB, both at eight GPUs per node. More memory per GPU can mean fewer nodes or less sharding for the same model, but whether it shortens your job depends on your model, your batch size and your code. Run the same job on both for a short, fixed window, record wall-clock time and node count, then multiply by each confirmed quote. An ML lead who does this once with a real checkpoint and real data has better proof for the budget meeting than any spec sheet can offer. For the hardware tradeoffs, see [H200 vs B200 for training and inference](https://pacificmachines.com/guides/h200-vs-b200). For H200 quote inputs, see [H200 pricing factors for reserved capacity](https://getpacific.space/blog/h200-pricing-factors-reserved-capacity). For a reserved-capacity view against the older generation, read this [B200 vs H100 comparison for reserved capacity buyers](https://getpacific.space/blog/b200-vs-h100-reserved-capacity). ## When reserved terms beat on-demand Reserved B200 terms pay off when your utilization stays high across the term. The risk you take on is paying for days you do not use. In Pacific's catalog each longer reserved band shows a lower preview rate than the band before it and than on-demand. That only helps if your queue keeps the nodes busy. Start narrow. Rent one node on demand through [Pacific's GPU rental](https://pacificmachines.com/gpu-rental) for a day or a week, measure real throughput and idle hours, then size the reservation from that proof. A team with a steady fine-tuning pipeline that runs every night for three months is a good fit for a longer band. A team still choosing model sizes should stay on shorter terms until the workload settles. ## Questions to ask before you commit Ask the hard questions during review, before money moves, and get written answers. Each one closes a gap between the preview and the bill. Ask whether the quote is confirmed or still a preview. Ask how many nodes are allocated, in which region and for which exact term band. Ask when handover happens, what state the node is in at handover, and what happens to local NVMe data when the term ends. Ask what changes if you extend, shrink or move from two nodes to four, since that step crosses into a by-request size. A procurement lead who gets these answers before signing avoids reopening the budget halfway through a run. The step-by-step path is in the [guide to renting B200 GPUs](https://pacificmachines.com/guides/how-to-rent-b200-gpus). ## When reserved B300 fits a long program A long, steady training program may fit a reserved B300 cluster better. That path trades self-serve speed for a reviewed, written offer. Pacific's reserved B300 offer is a single-tenant bare-metal cluster. Its Pod 32 reference comprises 32 HGX B300 nodes with a dedicated, configurable fabric, backed by witnessed factory, site and integration acceptance evidence. Configuration and delivery window are confirmed through a project review and written offer, and commercial terms are discussed privately on a qualified call. The deployment timeline is a target confirmed site by site, never a guaranteed date. If your roadmap runs past the six-month ceiling of B200 rental durations and needs one fabric across many nodes, read about [reserved B300 capacity](https://pacificmachines.com/b300-reservations) before you lock a B200 plan. For a written reservation checklist, see [how to reserve NVIDIA B300 GPUs](https://getpacific.space/blog/reserved-b300-gpu-capacity). ## How to get a current B200 quote from Pacific The most direct route to a real B200 number is a review in the catalog. Preview rates give you a starting point, and review gives you the figure you can budget. Open [Pacific Compute](https://pacificmachines.com/compute), select B200 SXM, pick a size, a region and a term, then go to review. One-node and two-node sizes rent directly, and four-node and eight-node sizes and reserved bands go through a request. Availability shown is recorded by Pacific and confirmed when an order is accepted. A finance lead who brings the reviewed quote, the measured job time and the planned term into one sheet has everything needed to compare offers on the same footing. When you are ready, [start a B200 quote in the Pacific catalog](https://pacificmachines.com/compute). --- # GB200 Price: What Moves the Cost of GB200 NVL72 Source: https://pacificmachines.com/guides/gb200-price-cost-drivers GB200 price explained: why GB200 NVL72 is quoted per rack, what moves the cost of rental or reserved capacity, and how to compare quotes line by line. ## Why GB200 has no list price GB200 NVL72 is sold by the rack, so there is no single per-GPU price. Pacific's catalog lists it by request, with pricing by request, because the quote depends on scope you have not chosen yet. The unit of purchase is one NVL72 system: 72 GPUs, 186 GB per GPU, in a dedicated rack. Sizes run 1, 2 or 4 racks, which means 72, 144 or 288 GPUs. A finance lead who searches for a GB200 price and expects a per-GPU hourly figure will find a request path instead, because the number only exists once rack count, term and region are fixed. Price follows scope. Fix the scope first. ## The four inputs that size the quote Rack count, term, region and tenancy set most of a GB200 quote. Each one is a choice you make before Pacific prices anything, and each one moves the total. Start narrow on rack count. One rack is a single NVLink domain of 72 GPUs, while two or four racks add capacity and also add questions about how the racks connect and whether your job spans them. Terms run 1, 2, 3 or 6 months, all by request. Longer terms change the commercial shape of the quote, so ask for the term your plan can actually fill. Region options are Asia Pacific, North America and Europe. A platform team serving users in Europe while keeping training data in North America should price both regions, because data movement and residency rules can matter as much as the rack itself. Tenancy is dedicated. You get SSH access to bare-metal Linux hosts with NVIDIA drivers and CUDA installed, and you pay for the whole rack whether it is busy or idle. ## Interconnect and Arm software effort The NVLink rack is the reason to buy GB200, and it carries extra scope. The catalog describes the interconnect as an NVLink rack confirmed with your order, so the exact fabric detail belongs in the quote you review. Ask what sits outside the rack. Data has to reach the hosts, multi-rack jobs have to talk across racks, and checkpoints have to land somewhere, so confirm which of these are included and which are quoted separately. GB200 pairs Blackwell GPUs with Grace CPUs, which use the Arm architecture. An ML engineer porting a training stack built on x86 hosts should budget time to rebuild container images, check Python wheels and custom kernels, and rerun a short job on Arm before the first full run starts using rack time. That effort is part of the price. Ask Pacific what is preinstalled on the hosts and what your team has to bring. ## Idle rack cost and utilization A rack-scale system pays off only when your job uses the rack. Cost per finished job is the number that matters, and an idle NVLink domain raises it fast. A team fine-tuning a model that fits comfortably on one 8-GPU node will pay for 72 GPUs while most of them wait, which makes the rack an expensive way to run a modest job. A good test: list the jobs that need fast GPU-to-GPU bandwidth across more than one node's worth of GPUs. If that list is short, the rack will sit partly empty for much of the term. If you plan to pack several smaller jobs onto one rack, confirm your scheduler and tooling can split it cleanly on these hosts. Shared use of a dedicated rack is your job to manage. ## How to read a GB200 quote line by line Read every GB200 quote as a per-rack commitment with named inclusions. Then check which lines are firm and which are confirmed only when the order is accepted. Start with the unit: rack count, GPUs per rack, term and region. Then find what is included per rack, such as dedicated bare-metal hosts, SSH access, NVIDIA drivers and CUDA, and the NVLink rack interconnect. Look for the lines marked as confirmed with your order. Interconnect detail and availability both sit there, and Pacific's review step revalidates capacity, the current quote and terms before you commit. Plan the exit. Local NVMe is erased when the resource ends, so a buyer running a 3-month training run needs a copy-out step for checkpoints and logs scheduled before the term closes. For the general factors behind any GPU quote, see [GPU cloud pricing cost drivers](https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers). ## When an 8-GPU node is the better unit A job that fits on 8-GPU nodes often costs less to finish there than on a 72-GPU rack. Compare cost per finished job; the per-GPU figure tells you little on its own. B200 SXM nodes in Pacific's catalog show on-demand preview rates, with 1-node and 2-node sizes rentable directly, while B300 SXM nodes run by request in sizes of 1 to 8 nodes. A research team running inference, fine-tuning or training that scales well over InfiniBand can often start on a node, prove the workload, then decide whether a rack is justified. The [B200 price and cost drivers guide](https://pacificmachines.com/guides/b200-price-cost-drivers) covers that HGX-class path. Use the [HGX B300 specs buyer checklist](https://getpacific.space/blog/hgx-b300-specs-buyer-checklist) to confirm the B300 node configuration. GB300 NVL72 is the adjacent rack option in the same catalog, listed the same way with 288 GB per GPU and pricing by request. If you are choosing between rack-scale GB200 and node-based B300 for a longer commitment, this [GB200 vs B300 comparison for reserved capacity](https://getpacific.space/blog/gb200-vs-b300-reserved-capacity) walks through the system choice. The [GB300 vs B300 comparison for reserved capacity](https://getpacific.space/blog/gb300-vs-b300-reserved-capacity) covers the Blackwell Ultra choice. For the B300 commitment, see [what to put in writing when reserving B300 GPUs](https://getpacific.space/blog/reserved-b300-gpu-capacity). Compare the options side by side in the [Pacific Compute catalog](https://pacificmachines.com/compute) before you request a rack. ## Questions to ask before you commit Ask these questions before a GB200 rack goes into your budget. Each one closes a gap between the quote and the job you will actually run. Ask how the NVLink rack interconnect is confirmed for your order, and how racks connect if you take two or four. Ask what storage, data ingress and networking sit around the rack, and which of them are priced separately. Ask what software is on the hosts and what your team must rebuild for Arm. Ask how availability is confirmed, when the resource becomes ready after acceptance, and what happens to local data at the end of the term. Do not compare a GB200 quote to an on-demand node rate without normalizing for term, rack count and utilization. A paid order is not a ready resource, so plan your schedule around confirmed readiness. ## Get a current GB200 quote from Pacific A current GB200 quote starts in the catalog and ends in review. The scope decisions take most of the time. Open the [Pacific Compute catalog](https://pacificmachines.com/compute), pick GB200 NVL72, then choose rack count, region and term. Submit the request, and Pacific confirms the allocation and returns the quote for review before anything is committed. An infrastructure lead preparing a budget request should bring a short workload description, the target region, the term and a note on Arm readiness to that review, so the quote reflects the job and the rack it actually needs. For the full step-by-step path, read [how to rent GB200 GPUs](https://pacificmachines.com/guides/how-to-rent-gb200-gpus). For node-based options and other GPU types, see [GPU rental at Pacific](https://pacificmachines.com/gpu-rental). --- # GPU Cloud Pricing: What Drives the Hourly Rate Source: https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers GPU cloud pricing depends on hardware, allocation shape, term and included services. Learn how to compare rental quotes on the same scope before you commit. ## What a GPU cloud price actually covers A GPU cloud price is a quote for a defined scope of work. The number only means something once you know which hardware, how much of it, for how long and with which services attached. Pacific frames [GPU rental pricing](https://pacificmachines.com/gpu-rental) around four drivers: the hardware selected, the quantity and shape of the allocation, the term, and the services included. Networking, storage, support and deployment requirements can change the discussion after the first number is on the table. Picture an infrastructure lead holding three quotes for the same training run, each with an hourly figure, and none of them describing the same nodes, the same term or the same storage. Those quotes cannot be ranked yet. Settle the scope first. Price comes second. ## The unit of purchase sets the commitment Ask how the unit of purchase is defined before you compare any rate. A listed GPU, a full node and a dedicated cluster carry different commitments, even when each is described per GPU-hour. A per-GPU figure is easy to read, and it can still hide the real purchase. On Pacific's [GPU compute catalog](https://pacificmachines.com/compute), the H100 listing shows sizes from one node upward, and each node carries eight GPUs. A price for a single GPU cannot be assumed to represent a whole cluster. When a team moves from one node for debugging to many nodes for a full training job, the fabric, the placement and the terms can all shift, so get the cluster quoted as a cluster. A good test: ask each provider to restate the quote in the unit you will actually deploy. ## Hardware, memory and allocation shape Hardware selection is the first driver of the rate you see. Memory per GPU then decides whether a model fits, how you shard it and how many nodes you need. Pacific's catalog lists H100 SXM at 80 GB, H200 SXM at 141 GB and B200 SXM at 180 GB, each eight per node, with preview rates per GPU-hour. B300 SXM at 288 GB, GB200 NVL72 and GB300 NVL72 are priced by request. Quantity and shape matter as much as the model. If your fine-tuning job fits in one node on a larger-memory GPU but needs two nodes on a smaller one, the lower hourly card can produce the larger bill once interconnect and run time are counted. Price the job you run. ## Term: on-demand and reserved are different buying motions On-demand rental and a reservation are separate buying motions with separate commitments. Treat them as two products when you build a comparison. The H100 listing on Pacific shows on-demand availability plus reserved terms of 7 to 30, 31 to 90 and 91 to 180 days by request. The listing also shows a per-day figure before tax, which helps you read the term as a budget line. A research team running a short evaluation sprint needs different flexibility than a team keeping a cluster busy for a quarter, and each will weigh the hourly number against how much idle time it is willing to pay for. For a structured way to weigh the two, read this guide on [evaluating reserved vs on-demand GPU instances](https://trypacific.space/blog/reserved-vs-on-demand-gpu-evaluation). Then apply it to your own run pattern. ## What is included in the node Two nodes with the same GPU can carry very different value. Check the interconnect, storage, access level and data handling before you treat two rates as equal. Pacific's H100 listing describes [dedicated bare-metal Linux nodes](https://trypacific.space/blog/bare-metal-gpu-cloud-evaluation) with SSH access, NVIDIA drivers and CUDA installed, local NVMe and InfiniBand interconnect, along with node specs for CPU and memory. Local NVMe is erased when the resource ends. If your team expects to attach shared storage, run multi-node jobs over a fast fabric and hand off clean data at the end of a contract, each of those needs to be written into the quote or confirmed as out of scope. Missing services become later line items. Ask about them now. ## How to compare GPU cloud quotes on the same scope A short worksheet makes [GPU cloud pricing comparable across providers](https://trypacific.space/blog/gpu-cloud-provider-evaluation-checklist). Fill it in once, then send the same scope to every vendor. Write down workload size in nodes and GPU model, expected run length, the time between runs, and dependencies such as storage, networking, support and deployment requirements. Include run length and the gaps between runs when you estimate total cost, because idle reserved time and repeated setup time both land in the budget. A team that trains for a few days and then spends weeks on evaluation and data work may find a reservation sitting idle between runs, while a team with back-to-back jobs may find repeated on-demand setup adds up. Then confirm the moving parts. Pacific's preview rates are indicative until Pacific confirms the allocation, and they do not come from a live inventory feed. Review revalidates capacity, the current quote and terms before you commit. A paid order is not a ready resource, so ask every provider when capacity becomes usable. ## When reserved or dedicated capacity changes the math Dedicated capacity shifts the comparison from hourly rates toward delivery terms. At cluster scale, configuration, acceptance evidence and the delivery window matter alongside price. Pacific's [reserved B300 cluster offer](https://pacificmachines.com/b300-reservations) is a single-tenant bare-metal cluster. The Pod 32 reference comprises 32 HGX B300 nodes with a dedicated, configurable fabric, backed by witnessed factory, site and integration acceptance evidence. Configuration and the delivery window are confirmed through a project review and a written offer, and commercial terms are discussed privately on a qualified call. The targeted deployment timeline is confirmed site by site and is never a guaranteed date, so read [Pacific's reserved capacity page](https://pacificmachines.com/rent) with that dependency in mind. If a permanent facility is delayed, Pacific offers [bridge capacity for delayed facilities](https://pacificmachines.com/rent). A platform team waiting on a stalled build can price the bridge term against the cost of pausing training until the permanent site is ready, then decide with both numbers on the page. ## How to start with Pacific Start narrow with one workload and one quote you can check. Pick the GPU type and size that matches your worksheet, then review the full commitment before you rent or request. Use the [Pacific Compute catalog](https://pacificmachines.com/compute) to compare preview rates for H100 SXM, H200 SXM and B200 SXM, and request pricing for B300 SXM, GB200 NVL72 and GB300 NVL72. Availability shown is recorded by Pacific and confirmed when an order is accepted. If the job needs a reserved term or a dedicated cluster, follow the steps in [how to reserve GPU capacity](https://pacificmachines.com/guides/how-to-reserve-gpu-capacity) and bring your worksheet to the qualified call. The budget conversation moves faster when the scope is already settled. Run one job, check the quote, then commit. --- # H100 vs H200: Which GPU to Rent for Your Workload Source: https://pacificmachines.com/guides/h100-vs-h200 H100 vs H200 for training, fine-tuning and inference: when 80 GB is enough, when 141 GB pays off, how to pilot both and compare cost per finished job. ## Same generation, different memory H100 and H200 are the same Hopper generation with different memory. In Pacific's catalog, H100 SXM lists 80 GB per GPU and H200 SXM lists 141 GB per GPU, both in 8-GPU nodes. NVIDIA's published specs also give the H200 higher memory bandwidth. For most buyers, those two facts carry the decision: more room for weights, activations and KV cache, and less time spent waiting on memory reads. If your team is choosing nodes for a fine-tuning run next week, the useful question is whether your model and working set fit comfortably in 80 GB per GPU, or whether they spill over. Memory decides most of this. Because both are Hopper, code written for H100 generally carries over to H200. Still confirm your driver, CUDA and framework versions before you move a job. ## When H100 is the sensible rental Rent H100 when your model and working set fit in 80 GB with headroom. Headroom means room for batch size, optimizer state and activation spikes, measured on a real run. Compute-bound jobs are the other strong case. If profiling shows the GPUs busy with math and rarely stalled on memory, extra memory capacity and bandwidth add little to the finished result. H100 also fits when your stack is already tuned for it. A team with kernels, parallelism settings and checkpoint layouts dialed in on 80 GB parts can run a short experiment or an ablation sweep without retuning anything, so the experiment stays focused on the model. Start narrow. Short experiments rarely justify a hardware change. ## When H200 earns its place H200 earns its place when memory is the constraint on your job. The test is simple: you are cutting batch size, sharding more aggressively or offloading state just to fit. Large models per node are the clearest case. When a model needs two H100 nodes but fits in one H200 node, you remove cross-node traffic from every step, and that traffic is often where scaling efficiency goes. Long context and KV-cache-heavy inference also favor H200. An inference lead serving long prompts to many concurrent users watches the KV cache grow with every request, and more memory per GPU lets that cache stay on the card instead of forcing smaller batches or eviction. Fewer nodes for the same model also means fewer machines to schedule and monitor. For a step-by-step walkthrough, read the [H200 rental guide](https://pacificmachines.com/guides/how-to-rent-h200-gpus). ## Test the choice with a short pilot [A short pilot on your own workload](https://trypacific.space/blog/h100-cloud-rental-evaluation) settles this better than any spec sheet. Run the same code and the same data on both node types, with only the hardware changed. Measure useful work per run. That means tokens trained, samples processed or requests served at your target latency, counted over a window long enough to include checkpoints and data loading. Then count nodes. A good test for a training lead is to find the smallest node count on each GPU that finishes the job inside the deadline, then compare those two configurations side by side with the same logging. Write down what you had to change to make each run fit. Workarounds on the smaller card are proof that memory is the bottleneck. ## Compare cost per finished job The right cost comparison is cost per finished job at the node count you need. A GPU-hour rate is one input to that number, and on its own it hides the rest. Preview rates in Pacific's catalog are indicative until Pacific confirms the allocation. Treat them as a planning input and wait for the confirmed quote before you build the budget. Multiply the confirmed rate by GPUs, nodes and hours to finish, then add time lost to retries and restarts. A finance partner reviewing the budget will want both configurations expressed as one total for the same deliverable, such as a trained checkpoint or a month of served traffic. Fewer nodes can offset a higher per-GPU rate, and the pilot tells you whether it does for your job. For the full set of factors, see [what drives GPU cloud pricing](https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers). For reserved quotes, see [H100 pricing factors for reserved capacity](https://getpacific.space/blog/h100-pricing-factors-reserved-capacity). ## What to confirm on either listing Confirm the node details in writing before you commit to either GPU. Pacific's H100 listing states dedicated bare-metal Linux nodes with SSH access, NVIDIA drivers and CUDA installed, and InfiniBand interconnect. The same listing says local NVMe is erased when the resource ends. Terms are on-demand, plus reserved terms of 7 to 30, 31 to 90 and 91 to 180 days by request. Those details are stated on the H100 listing. Ask Pacific to confirm the same for H200 nodes, along with the exact driver and CUDA versions installed, so the engineer setting up your first job knows which framework builds will run on day one without a rebuild. Availability shown in the catalog is recorded by Pacific and confirmed when an order is accepted. See Pacific's [GPU rental page](https://pacificmachines.com/gpu-rental) for how rentals are set up. ## When to look past Hopper Look past Hopper when your model outgrows 141 GB per GPU or your horizon is long. Pacific's catalog also lists B200 SXM at 180 GB per GPU, 8 per node, with on-demand preview rates. For longer commitments, B300 SXM at 288 GB per GPU is by request. Pacific's [reserved B300 offer](https://pacificmachines.com/b300-reservations) is a single-tenant bare-metal cluster, with configuration and delivery window confirmed through a project review and a written offer. A platform lead planning a capacity block for the next model generation should compare Hopper rentals against a reserved B300 cluster on the same cost-per-job basis, using a workload that represents what the team will actually run. This [comparison of H200 and B300 for reserved capacity buyers](https://getpacific.space/blog/h200-vs-b300-reserved-capacity) walks through that trade. Deployment timelines for reserved clusters are confirmed site by site. Treat any date as a target until it appears in the written offer. ## How to start with Pacific Start on [Pacific Compute](https://pacificmachines.com/compute) by picking a GPU type and node count. Choose H100 or H200 based on your pilot, and size to the node count you measured. Review revalidates capacity, the current quote and terms before you commit. That step is where a preview rate becomes a confirmed number. A paid order is not a ready resource. Plan your first job for after Pacific confirms the allocation and hands over access, so the team running the pilot or the production run is ready when the nodes are. If memory is clearly your constraint, [request H200 nodes on Pacific Compute](https://pacificmachines.com/compute). If you are unsure, rent the smaller configuration for a pilot first. --- # H200 vs B200: Which GPU Fits Your Workload Source: https://pacificmachines.com/guides/h200-vs-b200 H200 vs B200 for training, fine-tuning and inference: when Hopper is enough, when Blackwell earns its place, and how to pilot and compare cost per job. ## The one-line difference H200 vs B200 is a generation change from NVIDIA Hopper to NVIDIA Blackwell. In Pacific's catalog the first visible gap is memory: H200 SXM lists 141 GB per GPU and B200 SXM lists 180 GB per GPU, both in 8-GPU nodes. NVIDIA's published specs also give B200 more compute and higher memory bandwidth than H200, and they add lower-precision formats such as FP4. H200 is the mature Hopper option, with plenty of memory and a software path that teams have tuned for years. If you lead an ML or infrastructure team choosing nodes for a training run, a fine-tuning pass or an inference fleet, the real question is which generation finishes your work with less risk and less budget. If you are still deciding within Hopper, read the [H100 vs H200 comparison guide](https://pacificmachines.com/guides/h100-vs-h200) first. ## When H200 is the sensible rental Rent H200 when your model and working set fit in 141 GB with headroom. Headroom matters because activations, KV cache and optimizer state often grow past what the weights alone suggest. H200 also fits when your stack is already tuned for Hopper. A team serving a model with batching, kernels and quantization already dialed in on Hopper often gets more from that stable setup than from moving to new hardware and retuning everything. Short experiments are another good case. If you are testing a data mix, a learning rate schedule or a fine-tuning recipe, the most proven software path keeps your attention on the experiment. Fewer moving parts, fewer surprises. For the mechanics of booking Hopper nodes, see [how to rent H200 GPUs](https://pacificmachines.com/guides/how-to-rent-h200-gpus). ## When B200 earns its place B200 earns its place when your job is limited by compute or by memory. A good test is whether the extra headroom changes your plan, such as fewer nodes, less sharding or a shorter run. Compute-bound training is the clearest case. Large models are the second: a team that today spreads a model across extra nodes with tensor or pipeline parallelism may find that 180 GB per GPU lets it drop a sharding layer, which simplifies the code and the node count. Lower-precision formats such as FP4 only help if you are ready to use them. Validate accuracy on your own evals before you trust the result, and keep a higher-precision baseline to compare against. Longer runs are where faster time to finish pays off most. Prove the speedup on your own job before you plan around it. ## Check software readiness before you move a job Blackwell needs recent NVIDIA driver and CUDA releases plus framework builds that support it. Confirm those versions before you move a job, because a mismatch burns pilot time on setup instead of measurement. Walk the stack from the bottom up. Check the driver and CUDA versions on the node, your framework release, any custom or third-party kernels such as fused attention, your communication libraries and the container images your jobs actually launch from. An infrastructure engineer porting a training pipeline should rebuild the container against the supported CUDA release, run the unit tests and a short training step, then confirm that loss curves and eval scores match the Hopper baseline before anyone schedules the full run. Hopper stacks are mature and widely tuned. That maturity is a real asset, so count the porting work in your budget. ## Run a short pilot on your own workload Start narrow with [a short pilot on your own code and data](https://trypacific.space/blog/b200-cloud-rental-evaluation). Use the same model, dataset, batch logic and checkpoint cadence on both GPU types so the comparison holds. Measure useful work per run: tokens or samples processed for training, requests served at your latency target for inference. Record time to finish, the number of nodes the job needs, and any failures or restarts along the way. A good pilot for a fine-tuning team is one representative job run end to end on H200 and on B200, with the same eval suite at the end, so the lead can show finance and engineering a single page of proof. Write down the versions you used. A pilot result without its software stack attached is hard to repeat. ## Compare cost per finished job Compare cost per finished job and node count before you look at hourly rates. A per GPU-hour figure hides how many hours and how many nodes the job actually consumes. Take your pilot numbers and multiply through: rate times GPUs times hours to finish, plus the engineering time spent porting and validating. If B200 removes a node or shortens the run, that shows up here; if H200 finishes on fewer retries with no porting, that shows up too. Pacific Compute shows on-demand preview rates per GPU-hour for H200 and B200, and those rates are indicative until Pacific confirms the allocation. Use them for a first pass, then rerun the math on the confirmed quote. The [guide to GPU cloud pricing cost drivers](https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers) covers the other line items to include. ## When reserved B300 is the better question Look at reserved B300 when your horizon is long and memory per GPU dominates. In Pacific's catalog B300 SXM lists 288 GB per GPU in 8-GPU nodes, and it is offered by request. Pacific's [reserved B300 cluster offer](https://pacificmachines.com/b300-reservations) is a single-tenant bare-metal cluster. The Pod 32 reference comprises 32 HGX B300 nodes with a dedicated, configurable fabric, plus witnessed factory, site and integration acceptance evidence. A platform team planning a long training program on a dedicated cluster should treat this as a project review: configuration and delivery window are confirmed through a written offer, and the deployment timeline is a site-specific target set out in that offer. For the step beyond B200, read this [comparison of B300 vs B200 for reserved capacity buyers](https://getpacific.space/blog/b300-vs-b200-reserved-capacity). For the H200 reservation alternative, see [H200 vs B300 for reserved capacity](https://getpacific.space/blog/h200-vs-b300-reserved-capacity). ## How to start with Pacific Pick a GPU type and size on [Pacific Compute](https://pacificmachines.com/compute), then review the full commitment. Review revalidates capacity, the current quote and terms before you commit. Confirm the node details for your choice. Pacific's H100 listing states dedicated bare-metal Linux nodes with SSH access, NVIDIA drivers and CUDA installed, InfiniBand interconnect, local NVMe erased when the resource ends, and on-demand plus reserved terms by request. Ask Pacific to confirm the same for H200 and B200 nodes, along with the exact driver and CUDA versions you need. Availability shown is recorded by Pacific and confirmed when an order is accepted. A paid order is not a ready resource, so plan your pilot start around confirmation. For the broader rental process, see the [GPU rental overview](https://pacificmachines.com/gpu-rental). --- # B200 Rental: How to Rent B200 GPUs on Pacific Source: https://pacificmachines.com/guides/how-to-rent-b200-gpus How to rent B200 GPUs from Pacific's catalog: pick type and size, choose on-demand or a reserved term, and confirm drivers and region before you commit. ## What you are renting with B200 SXM B200 SXM is NVIDIA's Blackwell generation GPU, listed with 180 GB of HBM and 8 per node. In Pacific's catalog you rent it as a [dedicated bare-metal node](https://trypacific.space/blog/bare-metal-gpu-cloud-evaluation), so the whole host is yours for the term. This guide covers one path: how to pick, book and confirm B200 on [Pacific Compute](https://pacificmachines.com/compute). If you are still weighing providers against each other, read this [guide to evaluating B200 cloud rental providers](https://trypacific.space/blog/b200-cloud-rental-evaluation) first. Come back when you are ready to book. A typical reader is an ML lead with a training run or fine-tuning backlog that has outgrown its current nodes, who needs to know what the listing promises and what still gets confirmed after an order. The rest of this guide follows that order. ## When B200 is the right rental Rent B200 when memory per GPU is the real constraint on your work. If your jobs already fit comfortably on H200, the extra memory may not lower what each finished job costs you. B200 SXM lists 180 GB per GPU against 141 GB on H200 SXM. That gap matters for larger models, longer contexts and bigger batches that would otherwise need more sharding across GPUs. A team running a recurring fine-tuning job on a mid-sized model may find H200 nodes finish the same work with less migration effort, while a team training a larger model gets more from the B200 headroom. If the choice is still open, work through [H200 vs B200 for your workload](https://pacificmachines.com/guides/h200-vs-b200) before you book. If H200 wins, the [steps to rent H200 GPUs](https://pacificmachines.com/guides/how-to-rent-h200-gpus) follow the same dedicated bare-metal pattern. If you need a fixed large cluster for many months, a rental may be the wrong shape. The reserved B300 section below covers that case. ## Check software readiness for Blackwell first Blackwell GPUs need recent NVIDIA driver and CUDA releases, so your stack must keep up. A good test is whether your framework build and container image already list Blackwell support. The B200 listing says NVIDIA drivers and CUDA are installed on the host. Ask which versions, then check them against what your framework, compiled kernels and container base image expect. Before you book, have one engineer pull your production image, note the CUDA version it was built against, and list any custom kernels or extensions that would need a rebuild for the new architecture. That list is your readiness check. Do this before the clock starts. A rented node that sits idle while you rebuild images is budget spent on setup. ## Start on Pacific Compute and pick a term The catalog flow is short: pick a GPU type and size, then review the commitment. The review step does the real work, because it revalidates capacity, the current quote and terms before you commit. Open the catalog, select B200 SXM, and read the full listing: dedicated nodes, multiple regions, SSH access to bare-metal Linux hosts, InfiniBand interconnect and local NVMe erased when the resource ends. For background on how Pacific handles [dedicated GPU rental](https://pacificmachines.com/gpu-rental), read that page next to the listing. On-demand suits short proof work and bursty jobs. If you are testing a new training recipe, [start on-demand for the proof run, then move to a reserved band](https://trypacific.space/blog/reserved-vs-on-demand-gpu-evaluation) once you know how many nodes a full run needs and for how long. Reserved terms of 7 to 30, 31 to 90 and 91 to 180 days are available by request. Larger sizes can move from rent to by request, so a bigger node count may route to a conversation before it books. The [steps to reserve GPU capacity](https://pacificmachines.com/guides/how-to-reserve-gpu-capacity) cover what that request involves. ## What to confirm before you commit Treat the listing as the starting record and confirm each line before you pay. A paid order is not a ready resource, and availability shown is confirmed only when Pacific accepts the order. Check the node configuration on the listing: GPU type, count per node and dedicated host. Confirm InfiniBand covers the node count you plan to run across. Confirm driver and CUDA versions against your image. Confirm the region. The listing shows multiple regions, so ask which one your allocation lands in and whether it suits your data location and access rules. Ask where the support boundary sits: what Pacific handles on the host and what stays with your team. An infrastructure lead planning a long training run should record the delivery confirmation received at order acceptance and schedule the first job from that confirmation. Local NVMe is erased at the end, so plan checkpoint exports early. ## How the pricing conversation works Preview rates on the listing are indicative until Pacific confirms the allocation. They do not come from a live inventory feed, and review revalidates the current quote before commit. Do not compare GPUs on the hourly figure alone. Compare cost per finished job: node hours per run, time lost to setup and idle nodes, and how often a job restarts. A team moving a training run from H200 to B200 should estimate the full run on both, including image rebuilds and data transfer, before deciding which line in the budget actually goes down. That estimate is the number to bring to Pacific. The [GPU cloud pricing cost drivers guide](https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers) walks through the inputs that move it. Term length, node count and region all belong in the conversation. ## When reserved B300 is the better path Reserved B300 fits when you need a fixed cluster for a long program of work. It follows a different process: a single-tenant bare-metal cluster scoped through a project review and a written offer. Pacific's Pod 32 reference comprises 32 HGX B300 nodes with a dedicated, configurable fabric, backed by witnessed factory, site and integration acceptance evidence. In the catalog, B300 SXM lists 288 GB per GPU and is by request. If your roadmap needs the same large cluster for many months and your team wants acceptance evidence before go-live, a [reserved B300 cluster](https://pacificmachines.com/b300-reservations) is worth a qualified call before you stack B200 rental terms. Configuration and delivery window are confirmed in the written offer. Commercial terms are discussed privately. The deployment timeline is a target confirmed site by site, and it is never a guaranteed date. ## How to begin with Pacific Begin with one proof run on the smallest B200 size that answers your question. That run tells you whether your image works and how long a full job takes. Open the catalog, select B200 SXM, read the listing, and use review to confirm capacity, quote and terms. Raise your questions on region, InfiniBand, driver versions and support before you pay. When the proof run is done, bring the measured job length and node count back to Pacific so the next request, whether a reserved band or a larger by-request size, is scoped on evidence. Start narrow. Then scale on proof. --- # How to Rent GB200 GPUs From Pacific's Catalog Source: https://pacificmachines.com/guides/how-to-rent-gb200-gpus How to rent GB200 GPUs from Pacific's catalog: when GB200 NVL72 fits, what to confirm before commit, and how by-request pricing and review work. ## What GB200 NVL72 is, in one line GB200 NVL72 is a rack-scale Grace Blackwell system with 72 GPUs in one liquid-cooled rack. Arm-based Grace CPUs host the Blackwell GPUs, so the host side differs from the x86 nodes most teams run today. In Pacific's catalog, GB200 NVL72 is listed by request, with 186 GB per GPU, 72 GPUs per system and pricing by request. That listing tells you the shape of the system. It does not tell you what is free to allocate right now. If you are an infrastructure lead planning a large training run, treat the whole rack as the unit you rent, because the value of GB200 comes from its 72 GPUs working as one domain. One rack. One domain. ## When renting GB200 makes sense Rent GB200 when your workload needs many GPUs sharing one fast memory domain. A model that fits comfortably on an 8-GPU node rarely justifies the extra integration work. H200 and B200 are listed in the catalog as 8 GPUs per node with on-demand preview rates, which makes them the easier starting point for fine-tuning, inference serving and most experiments. If you are weighing those two, read [H200 vs B200 for training and inference](https://pacificmachines.com/guides/h200-vs-b200) first. A good test: if your team spends its days fighting cross-node communication on 8-GPU clusters for large mixture-of-experts or long-context training, a rack-scale system may shorten each step enough to change the cost of the finished job. Start narrow. If the job fits on nodes, rent nodes through [Pacific's GPU rental options](https://pacificmachines.com/gpu-rental). ## Starting on Pacific Compute Begin in the [Pacific Compute catalog](https://pacificmachines.com/compute) by picking a GPU type and size. For GB200 NVL72, that choice opens a by-request path instead of an instant order. Review the full commitment before you request anything. Pacific's review step revalidates capacity, the current quote and terms before commit, so the request turns into a conversation about a specific allocation. In practice, an ML lead selects GB200 NVL72, notes the system count and term the training plan needs, and raises it on project review with the workload, the target window and any facility constraints attached. A paid order is not a ready resource. Treat confirmation from Pacific as the moment capacity becomes real for your plan. ## What to confirm before you commit Get every rack-scale assumption written down before you sign anything. The offer or review should state the configuration baseline you are actually renting. Ask how the 72 GPUs connect inside the rack and how each rack connects to storage, to other racks and to your network. Interconnect expectations decide whether a multi-rack plan works at all. Confirm cooling and facility fit. GB200 NVL72 is liquid-cooled at rack scale, so ask where the system sits, who owns the power and cooling interfaces and what has been verified versus assumed. Before commit, have your platform engineer check that your container images, drivers and libraries build for Arm Grace hosts and support Blackwell GPUs, because an x86-only dependency can stall the first days on a rented rack. Then confirm acceptance criteria and the delivery window as stated in the written offer or review. ## How GB200 pricing conversations work GB200 NVL72 pricing is by request, so there is no catalog number to compare. Preview rates shown for other GPU types are indicative until Pacific confirms the allocation. Do not compare an hourly figure for a rack against an hourly figure for a node. Compare cost per finished job: total spend to reach a trained checkpoint or a served workload, including idle time, data movement, storage, engineering hours and failed runs. A useful budget exercise is to price the same training run on 8-GPU nodes and on a GB200 rack, then ask Pacific which assumptions in the rack quote are confirmed and which still depend on review. For the full set of factors, see [GPU cloud pricing and cost drivers](https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers). ## When reserved B300 is the better path Look at reserved B300 when you need a dedicated cluster for a long program. Renting from the catalog suits a defined job, and a reservation suits a roadmap. Pacific's [reserved B300 clusters](https://pacificmachines.com/b300-reservations) are [single-tenant bare metal](https://trypacific.space/blog/bare-metal-gpu-cloud-evaluation), with a Pod 32 reference of 32 HGX B300 nodes on a dedicated, configurable fabric. [Configuration and delivery window](https://getpacific.space/blog/b300-lead-time-reserved-capacity) are confirmed through a project review and written offer, backed by witnessed factory, site and integration acceptance evidence. If you are choosing between rack-scale Grace Blackwell and an 8-GPU B300 form factor for a reserved order, read [GB200 vs B300 for reserved capacity buyers](https://getpacific.space/blog/gb200-vs-b300-reserved-capacity). This guide stays on the rental path. ## The sibling guide for H200 rental If your workload fits on 8-GPU nodes, the H200 path is simpler to start. H200 SXM is listed with 141 GB per GPU and 8 GPUs per node, shown with on-demand preview rates. The steps in [how to rent H200 GPUs](https://pacificmachines.com/guides/how-to-rent-h200-gpus) mirror this guide: pick type and size, review the commitment, confirm the allocation, then plan onboarding. Running a pilot on H200 while a GB200 request goes through review gives your team a working baseline, a real cost per finished job and a tested software stack to compare against the rack quote. ## How to begin with Pacific Open the catalog, pick GB200 NVL72 and raise it on project review with your workload attached. Bring the training plan, the term you need and your hosting assumptions. Expect Pacific to revalidate capacity, the current quote and terms in review before commit. Until then, plan around confirmed facts and keep assumptions labeled as assumptions. If a facility delay is the reason you need rented capacity, say so early, because Pacific also offers bridge capacity and colocation for owned hardware, and the right path depends on your situation. Get the offer in writing. --- # How to Rent GB300 GPUs: NVL72 Racks by Request Source: https://pacificmachines.com/guides/how-to-rent-gb300-gpus How to rent GB300 NVL72 racks from Pacific: scope rack count, term and region, submit a request, and learn what review confirms before SSH access opens. ## Who GB300 NVL72 fits GB300 NVL72 fits work that needs one large NVLink domain kept busy. An NVL72 rack is a single NVLink domain of 72 GPUs, and Pacific lists GB300 with 288 GB per GPU in dedicated NVL72 racks. GB300 pairs Blackwell Ultra GPUs with Arm-based Grace CPUs. That pairing matters most when your model or job gains from many GPUs sharing one rack-scale fabric without crossing a network between nodes. A team serving a large mixture-of-experts model that spills past one node, and that loses throughput every time traffic crosses a network hop, is the buyer who gets the most from a full rack. An 8-GPU node is often the better unit. If your training run shards cleanly across nodes, or your inference service fits in one node's memory, a B200 or B300 node on [Pacific's compute catalog](https://pacificmachines.com/compute) is easier to scope. Start narrow when you can. ## The rental path, step by step Renting GB300 runs through a request and review, with no instant checkout. The catalog does not show GB300 as available now, so plan for review before any access. Open [the Pacific compute catalog](https://pacificmachines.com/compute) and select GB300 NVL72. Choose 1, 2 or 4 racks, which maps to 72, 144 or 288 GPUs, then pick a duration of 1, 2, 3 or 6 months and a region in Asia Pacific, North America or Europe. Every option is by request, and pricing is by request. Submit the request. Review then revalidates capacity, the current quote and terms before you commit, and once the order is accepted and the resource is ready, you reach [dedicated bare-metal Linux hosts over SSH](https://trypacific.space/blog/bare-metal-gpu-cloud-evaluation) with NVIDIA drivers and CUDA installed. A paid order is not a ready resource. An infrastructure lead booking a training window should hold the launch date loosely until review comes back, since the catalog shows recorded availability and order acceptance is what makes it real. For the general flow across GPU types, see [Pacific's GPU rental overview](https://pacificmachines.com/gpu-rental). ## What to scope before you request Write down five decisions before you submit a GB300 request. A clear request gives review something concrete to confirm, and it keeps your own budget honest. Rack count and term come first. Pick the smallest rack count that holds your job, and pick a duration that matches the run plus setup and teardown time. Region follows from where your data lives and where your users or downstream systems sit. Data movement and storage around the rack come next. Local NVMe is erased when the resource ends, so plan where datasets land, where checkpoints go and how results leave the rack before the term closes. Software readiness on the Grace Arm CPU is the step teams skip. Check that your containers, Python wheels, custom kernels and any host-side tools build and run on aarch64, then confirm the job plan keeps all 72 GPUs in the NVLink domain busy with input ready. ## What gets confirmed with the order The catalog listing tells you the shape of the offer before any order. Capacity, the quote and terms are what review confirms. The GB300 NVL72 listing states dedicated NVL72 racks, SSH access to dedicated bare-metal Linux hosts, NVIDIA drivers and CUDA installed, and local NVMe erased when the resource ends. The interconnect is listed as an NVLink rack, confirmed with your order. Treat everything else as open until review closes it. A buyer who has already told finance a start date should send review the exact rack count, term and region, then wait for the confirmed quote and terms in writing before moving any production timeline. For what moves a rack-scale quote, read [the GB200 price and cost drivers guide](https://pacificmachines.com/guides/gb200-price-cost-drivers). Rack count, term length and region shape a GB300 request in much the same way. ## Choosing between GB300 and GB200 NVL72 GB300 and GB200 NVL72 share the same listing shape on Pacific's catalog. Both are dedicated NVL72 racks with 72 GPUs per system, by request, in 1, 2 or 4 racks across the same regions and durations. The visible difference is memory per GPU: 288 GB on GB300 against 186 GB on GB200. Choose GB300 when your model, context length or batch plan needs that extra memory per GPU to avoid extra sharding. A research team that already fits comfortably on GB200, with headroom for checkpoints and activations, gains little by waiting on GB300 and can follow [the GB200 rental path](https://pacificmachines.com/guides/how-to-rent-gb200-gpus) instead. If you are weighing rack-scale GB300 against 8-GPU B300 nodes for a longer reservation, this [GB300 vs B300 comparison for reserved capacity buyers](https://getpacific.space/blog/gb300-vs-b300-reserved-capacity) covers that system choice. ## Questions to ask before you commit Ask review specific questions that turn a request into a confirmed order. Vague questions get vague answers, and your budget pays for the gap. Ask which region and rack count review has confirmed, and whether the interconnect matches what your order states. Ask how the term start is defined and what happens to data on local NVMe at the end. Ask how access is handed over, which drivers and CUDA versions are installed, and whether your Arm builds can be tested early. An ML lead planning a multi-week training run should also ask what the restart plan looks like if a host needs attention mid-term. Do not compare a GB300 quote against a node preview rate. They describe different units, so compare like with like. ## When a reserved commitment fits better Step up to a reserved commitment when a rental term stops matching the plan. A six-month rental is the longest GB300 term the catalog lists. If your roadmap needs dedicated capacity past that window, or a cluster delivered with acceptance evidence you can audit, read [how to reserve GPU capacity](https://pacificmachines.com/guides/how-to-reserve-gpu-capacity) before you extend renting term by term. Pacific's [reserved B300 offer](https://pacificmachines.com/b300-reservations) is a single-tenant bare-metal cluster built on a Pod 32 reference of 32 HGX B300 nodes with a dedicated, configurable fabric. [Configuration and delivery window](https://getpacific.space/blog/b300-lead-time-reserved-capacity) are confirmed through a project review and written offer, and the deployment timeline is confirmed site by site, never as a guaranteed date. A good test: if you would renew the same racks twice, price the reservation. --- # How to Rent H100 GPUs From a Compute Catalog Source: https://pacificmachines.com/guides/how-to-rent-h100-gpus How to rent H100 GPUs from Pacific's catalog: pick type and size, choose on-demand or a reserved term, and confirm node config before you commit. ## What you are renting with H100 SXM H100 SXM is NVIDIA's Hopper generation GPU with 80 GB of HBM, listed in 8-GPU nodes. The node is the unit you rent, so plan your job around eight GPUs sharing one machine and one interconnect domain. In Pacific's catalog, each H100 listing is a dedicated bare-metal Linux node with SSH access, NVIDIA drivers and CUDA installed, and an InfiniBand interconnect. Local NVMe is erased when the resource ends. A training lead who has been queuing behind other teams on a shared cluster gets a machine they log into directly, with the stack already in place and the hardware dedicated to their work. Treat local disk as scratch. Push checkpoints and outputs to storage you control before the term ends. ## When H100 is the right rental H100 fits when your model and batch already fit in 80 GB per GPU. That is a narrow test, and you can run it against your current code and configs before you rent anything. A team fine-tuning a mid-sized model on a stable recipe for a few weeks, with known memory use and a fixed eval set, is the classic H100 renter. The hardware is well understood, the software support is mature, and your existing images likely already target it. Start narrow. If you keep hitting memory limits, sharding more than you want, or serving long contexts, H200's 141 GB per GPU may save engineering time on the same recipe. The [H100 vs H200 comparison](https://pacificmachines.com/guides/h100-vs-h200) walks through that trade in plain terms, and the [how to rent H200 GPUs guide](https://pacificmachines.com/guides/how-to-rent-h200-gpus) covers the same catalog path for the larger card. For long programs that need a dedicated cluster on a newer generation, read the reserved B300 section below before you sign a long H100 term. ## Start in the Pacific Compute catalog The catalog path has two steps: pick a GPU type and size, then review. Review is where the full commitment shows up before you rent or request. Open [Pacific Compute](https://pacificmachines.com/compute), choose H100 SXM, and pick how many 8-GPU nodes you need. If you are still sorting out which rental option fits, the [GPU rental page](https://pacificmachines.com/gpu-rental) sets out Pacific's rental options in one place. Review revalidates capacity, the current quote and terms before you commit. An infrastructure lead sizing a four-node fine-tuning run should read that review screen the way they would read a purchase order, line by line, before anyone on the team clicks through. Availability shown in the catalog is recorded by Pacific and confirmed when an order is accepted. It is not a live inventory feed. Plan as if the number can move until acceptance, and keep your internal start date tied to that confirmation rather than to the click that placed the order. ## On-demand or a reserved term band Choose the term by how long the work actually runs. On-demand suits short or uncertain jobs where stopping early has real value. For H100, Pacific lists reserved terms of 7-30, 31-90 and 91-180 days, by request. A [reserved term trades flexibility for a committed window](https://trypacific.space/blog/reserved-vs-on-demand-gpu-evaluation), so pick the band your plan supports with evidence. A good test: write down the job sequence, the expected run count and the restart buffer, then see which band covers it without padding. A platform lead planning a quarter of continuous fine-tuning and eval cycles across two teams has a different answer than a researcher validating one idea over a long weekend. If the work clearly outgrows the longest band, read the [guide to reserving GPU capacity](https://pacificmachines.com/guides/how-to-reserve-gpu-capacity) before you request anything. ## What to confirm before you commit Confirm the node you will get matches the node your job needs. The listing describes the standard H100 setup, and your workload decides which details matter. For provider selection, see [how to evaluate H100 cloud rentals](https://trypacific.space/blog/h100-cloud-rental-evaluation). Check the node config: GPU count per node, CPU, system memory and local NVMe size. Check InfiniBand: ask whether your multi-node job will span nodes on the same fabric and what topology details Pacific can share for your NCCL setup. Check the driver and CUDA versions against your container images before day one. A team that pins a CUDA version in its training image and finds a mismatch after the first node comes up loses a day rebuilding, so ask for the installed versions during review. Ask where Pacific's support boundary sits, which layers Pacific handles and which stay with your team, and who you contact for each class of issue. Then confirm delivery. A paid order is not a ready resource, so ask how Pacific confirms the nodes are allocated and reachable over SSH, and how that confirmation shows up in writing. ## How the pricing conversation works Preview rates in the catalog are indicative until Pacific confirms the allocation. Treat them as a starting budget line and let review set the figure you can put in a purchase order. Do not compare GPU hours in isolation. Compare cost per finished job: hours to complete the run, restarts, idle time between experiments and engineering time spent on setup. The [guide to GPU cloud cost drivers](https://pacificmachines.com/guides/gpu-cloud-pricing-cost-drivers) breaks those inputs down. A finance partner asking why the team chose one card or term over another will accept the answer faster when you show a single job's total cost, from first launch to final checkpoint, side by side across options. Keep the inputs written down. That record is your proof at renewal. ## When reserved B300 is the better path Reserved B300 fits long programs that need a dedicated cluster, beyond a few rented nodes. It is a project with its own review and a written offer. Pacific's [B300 reservation offer](https://pacificmachines.com/b300-reservations) is a single-tenant bare-metal cluster, and the Pod 32 reference is 32 HGX B300 nodes with a dedicated, configurable fabric. Configuration and delivery window are confirmed through a project review and written offer, commercial terms are discussed privately on a qualified call, and the deployment timeline is a target confirmed site by site. If your roadmap has a frontier-scale training run that would otherwise mean stitching together H100 rentals for months, compare the paths with this [look at H100 versus reserved B300 capacity](https://getpacific.space/blog/h100-vs-b300-reserved-capacity) before you lock in a long H100 term. You can rent H100 for current work while a B300 review runs. ## How to begin with Pacific Start with one job you understand well and size the rental around it. That job becomes your proof for anything larger, because you can show hours, restarts and outcomes on hardware you already know. Open [the Pacific Compute catalog](https://pacificmachines.com/compute), select H100 SXM, pick the node count and term, then read the review screen against the checklist above. A lead who arrives with the job plan, the CUDA version pinned in their image and a clear answer on multi-node needs turns review into a quick confirmation. If the conversation points toward a longer reservation or B300, ask Pacific for a project review and bring the same plan. Then rent the nodes you sized. --- # How to Rent NVIDIA H200 GPUs: A Guide to H200 Rental Source: https://pacificmachines.com/guides/how-to-rent-h200-gpus H200 rental explained: when the H200 fits, what a listing should state, what to check before you commit, and when reserved GPU capacity makes more sense. ## When the H200 is the right pick The H200 makes sense when GPU memory limits your work. In Pacific's catalog the H200 SXM lists 141 GB per GPU and 8 GPUs per node. The H100 SXM lists 80 GB per GPU. That extra memory headroom is the main reason to choose the H200. Memory-bound workloads benefit most. These include serving large models with long context windows, holding big key-value caches, fine-tuning models that barely fit on smaller cards, and running larger batch sizes without sharding across more nodes. If your job spends its time waiting on memory, the H200 is worth testing. If your model fits comfortably in H100 memory and the bottleneck is elsewhere, such as data loading or traffic between nodes, the H200 may cost more for little practical gain. Profile a representative run first. The right answer depends on your model size, sequence length and parallelism plan. ## What an H200 rental listing should state A useful listing describes what you get in terms you can check. At minimum it should name the exact GPU variant and form factor, memory per GPU, GPUs per node, and whether the node is dedicated to you or shared. It should also state how you access the machine, what software comes installed, the interconnect between nodes, the local storage, what happens to your data when the rental ends, and which terms are available. If any of these are missing, ask before you pay. The [GPU rental overview](https://pacificmachines.com/gpu-rental) covers the same items across GPU types. Treat any displayed rate or availability as a starting point. Ask whether the figure comes from a live inventory feed or is an indicative preview, and at which step the provider actually commits capacity to you. ## How Pacific's catalog presents the H200 The [Pacific Compute catalog for H200 and other GPUs](https://pacificmachines.com/compute) lists the H200 SXM with 141 GB per GPU and 8 GPUs per node, shown with an on-demand preview rate. You pick a GPU type and size, then review the full commitment before renting or requesting. The preview rate stays indicative until Pacific confirms the allocation. The availability shown is recorded by Pacific and confirmed when an order is accepted. The review step revalidates capacity, the current quote and the terms before you commit. This matters because conditions can change between browsing and ordering. Payment comes before the resource is ready, so plan your start date around confirmation and ask during review when you can expect access. ## Checks to run before you commit Access comes first. Confirm how you log in and what you control. For reference, Pacific's H100 listing states [dedicated bare-metal Linux nodes](https://trypacific.space/blog/bare-metal-gpu-cloud-evaluation) with SSH access and NVIDIA drivers and CUDA installed. Confirm during review that your H200 order has the same access model and software baseline, and check that the driver and CUDA versions match what your stack expects. Next, interconnect and storage. The H100 listing states InfiniBand interconnect and local NVMe. If you plan multi-node training on H200, confirm the interconnect for your specific allocation and whether your nodes share a fabric. Size local storage against your checkpoints and datasets, and decide where durable copies will live. Then data handling and term. On the H100 listing, local NVMe is erased when the resource ends. Plan to copy results out before your end date, and confirm the H200 policy in writing. Check the term as well. On-demand suits short experiments, and the H100 listing offers reserved terms of 7 to 30, 31 to 90 and 91 to 180 days by request. Ask which terms apply to H200 for your order. ## What drives the cost of an H200 rental The rate per GPU hour is only one input. Total cost depends on how many nodes you need, how long you hold them, and how much of that time the GPUs are actually busy. Term length is a major driver. A longer commitment generally changes the quote compared with on-demand, while on-demand keeps your option to stop. Idle time is the cost teams tend to miss: nodes waiting on data, setup or debugging still count against the bill. For reserved quotes, see [H200 pricing factors for reserved capacity](https://getpacific.space/blog/h200-pricing-factors-reserved-capacity). Memory headroom can lower total cost even when the per-node quote is higher. If more memory per GPU lets a job run on fewer nodes or with less sharding, you may pay for less hardware overall. Run that comparison on your own workload, because the result depends on fit. Also count the engineering time spent moving data in and out, and any storage handling at the end of the term. ## When a dedicated or reserved cluster fits better On-demand rental works well for evaluation, bursts and projects of uncertain length. When you need a large block of capacity for months, or capacity tied to a production schedule, a reserved single-tenant cluster usually gives you more predictable access and a configuration built around your work. The guide on [how to reserve GPU capacity](https://pacificmachines.com/guides/how-to-reserve-gpu-capacity) walks through that process. Pacific's [reserved B300 clusters](https://pacificmachines.com/b300-reservations) are single-tenant bare metal clusters. The Pod 32 reference comprises 32 HGX B300 nodes with a dedicated, configurable fabric, and comes with witnessed factory, site and integration acceptance evidence. Configuration and delivery window are confirmed through a project review and a written offer. The targeted deployment timeline is confirmed site by site and is never a guaranteed date. If you are weighing staying on H200 against moving to reserved newer-generation hardware, this comparison of [H200 and B300 reserved capacity](https://getpacific.space/blog/h200-vs-b300-reserved-capacity) lays out the tradeoffs. If a permanent facility is delayed and you need capacity in the meantime, Pacific also offers [bridge capacity while a facility is delayed](https://pacificmachines.com/rent), along with colocation if you own your hardware. ## How to start with Pacific Start in the [Compute catalog](https://pacificmachines.com/compute). Select H200 SXM and the node count you need, then go through review to see the revalidated capacity, quote and terms before you commit. Treat the preview rate as indicative until Pacific confirms the allocation. For larger or longer work, such as a dedicated cluster or a multi-month reservation, request a call through the [reserved capacity page](https://pacificmachines.com/rent). Bring your model sizes, target term, interconnect needs and data handling requirements so the conversation can move to a project review and a written offer. Commercial terms are discussed privately on a qualified call. --- # How to reserve GPU capacity with Pacific Source: https://pacificmachines.com/guides/how-to-reserve-gpu-capacity Prepare for a Pacific capacity call with your workload, cluster requirements, location, and timing. ## Start with the workload Pacific discusses [reserved, single-tenant GPU capacity](https://pacificmachines.com/rent) for teams that need a dedicated cluster. Bring the workload, required cluster shape, location, and timing to a capacity call. ## Review the deployment plan Configuration, deployment, acceptance, and commercial terms are reviewed for the particular project. Pacific discusses reserved-capacity commercial terms privately on a qualified call. Review the [GPU rental guide](https://pacificmachines.com/gpu-rental) when planning your requirements. For a dedicated pod, include [privileged session recording evaluation](https://trypacific.space/blog/evaluate-gpu-pod-privileged-session-recording) in the acceptance review to check how administrative access is recorded and evidence is retained. If the deployment uses a powered site while a permanent facility is delayed, review [stranded power and unused grid offtake](https://gopacific.space/blog/stranded-power-unused-grid-offtake) to prepare the site questions for your capacity call.